Read More
Industrial - Rocky Mountain Region
Vestas USA II Blade Manufacturing Facility
- Brighton, CO
- Mortenson Construction
- 360,000 sq ft manufacturing | 36,000 sq ft office space
Owner
Ford Motor Company
Size
350,000 sq ft
Full-service design/assist-build for HVAC, plumbing, and process installation for the 350,000-sq-ft PN 96 Commercial Truck Body Shop at Ford’s Claycomo, Mo., Assembly Plant. The scope included installing and hooking up fifteen 46,000-CFM air handling units; plumbing; and installing a process utility distribution of welder water cooling system, compressed air, and city water. U.S. Engineering also performed work on a new kitchen and locker room.
Featured Work